Search
7 questions · 1 formulas
Linear probability model
P(Y=1|X) = Xβ; ΔP = β·ΔX (percentage points)
Trap: Percentage points, not percent.
ProbitD–A level★ High priority — official Canvas exampleWith FIXRATE=12 and NETWORTH=7, MARGIN rises from 2 to 4. Discrete change in Probit probability?
→ B) approximately -15.2 percentage points
Canvas Example MCQ — Q91
- A) approximately -7.0 percentage points
- B) approximately -15.2 percentage points
- C) approximately -20.0 percentage points
- D) approximately +15.2 percentage points
- E) None of A-D is close; write the correct answer.
At MARGIN=2, z=.50 -> P=.6915. At MARGIN=4, z=.10 -> P=.5398. Change = .5398-.6915 = -.1517 = -15.17 pp.
Rule: For a discrete nonlinear change, calculate both probabilities and subtract.
ProbitD–A levelVery high priorityUsing Model 1, P(ADJUST=1)=Φ[-7.0166+0.5301·FIXRATE-0.2675·MARGIN+0.0864·NETWORTH], compute the predicted probability for FIXRATE=12, MARGIN=2, NETWORTH=3. The linear index works out to z=-0.9312.
→ A) ≈17.59%
Computer Lab 6 — Exercise 3, Task c
- A) ≈17.59%
- B) ≈82.41%
- C) ≈37.21%
- D) ≈93.12%
P = Φ(-0.9312) ≈ 0.1759 = 17.59%, reading the standard normal CDF at z = -0.9312.
Rule: Compute z=Xβ first, then look up Φ(z) for the predicted probability.
ProbitD–A levelVery high priorityStill using Model 1, increasing NETWORTH from 3 to 10 (holding FIXRATE=12, MARGIN=2) changes the predicted probability from about 17.59% (z=-0.9312) to about 37.21% (z=-0.3264). What is the change in predicted probability, in percentage points?
→ A) +19.62 percentage points
Computer Lab 6 — Exercise 3, Task c comparison
- A) +19.62 percentage points
- B) +211.6% relative change only, not expressible in percentage points
- C) -19.62 percentage points
- D) +1.962 percentage points
Change = 37.21% − 17.59% = 19.62 percentage points, consistent with the positive NETWORTH coefficient.
Rule: For discrete changes in nonlinear probability models, compute new probability minus old probability directly.
ProbitD–A levelVery high priorityFor an actual 2-unit increase in MARGIN (2→4) in Model 2, with FIXRATE=12, the probabilities are P(MARGIN=2)=Φ(-1.167)≈12.16% and P(MARGIN=4)=Φ(-1.556)≈5.99%. What is the correct discrete change in probability, and why shouldn't it equal 2×(-3.93pp)?
→ A) -6.18 percentage points; Probit is nonlinear so the marginal effect changes as X changes, making it invalid to simply double the local marginal effect for a large discrete move
Computer Lab 6 — Exercise 3, Task f discrete
- A) -6.18 percentage points; Probit is nonlinear so the marginal effect changes as X changes, making it invalid to simply double the local marginal effect for a large discrete move
- B) -7.86 percentage points (exactly 2×-3.93), because Probit effects are linear
- C) +6.18 percentage points, since probability must rise as MARGIN rises
- D) 0 percentage points, since probability is bounded between 0 and 1
Change = 5.99% − 12.16% = -6.18 percentage points. Because Probit is nonlinear, φ(Xβ) differs at MARGIN=2 versus MARGIN=4, so simply doubling the local marginal effect (which assumes linearity) would be inaccurate; always compute P_new − P_old for discrete changes.
Rule: For discrete changes in nonlinear probability models, always use P(new X) − P(old X), not linear-effect×Δx.
LogitE-levelVery high priorityWhat are two well-known weaknesses of the Linear Probability Model (LPM) compared to Probit or Logit for a binary dependent variable?
→ A) Predicted probabilities can fall outside [0,1], and errors are heteroskedastic by construction, so robust standard errors are generally preferred
Computer Lab 6 — Exercise 4, LPM weaknesses
- A) Predicted probabilities can fall outside [0,1], and errors are heteroskedastic by construction, so robust standard errors are generally preferred
- B) LPM cannot estimate coefficients at all for binary outcomes
- C) LPM coefficients cannot be interpreted in percentage-point terms
- D) LPM always has a lower R² than Probit or Logit
Because LPM is linear, predicted probabilities are not constrained to [0,1], and the binary nature of Y produces heteroskedastic errors, making robust standard errors advisable, even though the coefficients remain directly interpretable in probability terms.
Rule: Key LPM limitations: possible out-of-range probabilities and heteroskedastic errors; use robust SEs.
ProbitD–A levelVery high priorityFor Black applicants, a PIRAT decrease from 0.35 to 0.30 implies a Probit discrete change of about -4.40 pp, while for White applicants it implies about -2.14 pp — different magnitudes, unlike the LPM's identical -2.80 pp for both groups (with no interaction term). Why does Probit produce different magnitudes for the two groups even without an explicit PIRAT×BLACK interaction?
→ A) Because Probit is nonlinear: the marginal/discrete effect of PIRAT depends on the predicted probability level itself, which differs by BLACK status even without an explicit interaction term
Computer Lab 6 — Exercise 4, Probit vs LPM nonlinearity
- A) Because Probit is nonlinear: the marginal/discrete effect of PIRAT depends on the predicted probability level itself, which differs by BLACK status even without an explicit interaction term
- B) Because the Probit model actually includes an interaction term between PIRAT and BLACK
- C) Because Probit coefficients differ by group automatically
- D) This is a calculation error; Probit should give identical effects just like LPM
Even without an interaction term, Probit's nonlinear Φ(·) link function makes the implied probability effect of any regressor depend on the overall linear index (and thus on BLACK, which shifts the index), unlike LPM where effects are mechanically constant across groups.
Rule: Nonlinear models (Probit/Logit) naturally produce covariate-dependent marginal effects even without explicit interaction terms, unlike the linear LPM.
LogitD–A levelVery high priorityUsing Model 2 Logit: P(DENY=1)=Λ[-4.1256+5.3704·PIRAT+1.2728·BLACK], for a Black applicant at PIRAT=0.35, the index is z=-0.9805. Using Λ(z)=1/(1+e^-z), what is the predicted denial probability (compare to the table value ≈27.28%)?
→ A) ≈27.28%
Computer Lab 6 — Exercise 4, Logit calc
- A) ≈27.28%
- B) ≈72.72%
- C) ≈49.51%
- D) ≈9.05%
Λ(-0.9805) = 1/(1+e^0.9805) = 1/(1+2.6654) ≈ 1/3.6654 ≈ 0.2728 = 27.28%, matching the lab's reported value.
Rule: Logit predicted probability: Λ(z) = 1/(1+e^(-z)), computed directly from the linear index z.